PLN50804B SPR Site Plan Review
Address:
568 Ericksen Ave NE
Bainbridge Island,  WA  98110
Parcel #: 26250220512009
Status: Application has all components for review.
Submitted: 8/29/2018
Approved:
Issued:
Closed:
Expires: 3/25/2019
Inspections:
Required: 3
Complete: 0
Total Fees:
$11,08600
Additional fees may be required
Project: Condominium development of six (6) freestanding townhomes and preservation of an existing residence listed on the Local Historic Register.

Contacts
OWNER: WING POINT PROPERTIES LLC
APPLICANT: WING POINT PROPERTIES LLC

Contractors

Details

Parcels
Parcel Owner Address
26250220512009 WING POINT PROPERTIES LLC 568 Ericksen Ave NE
Bainbridge Island,  WA 98110

Submittals
If any submittal item(s) listed below is noted as "required", you will not be able to issue your permit. Please upload the required submittal item before proceeding.
Submittal Required Received Accepted
Plan set No 8/29/2018 9/26/2018
Survey of Property No 8/29/2018 9/26/2018
Authorization for 3rd Party Review for Geotechnical Requirements No 8/29/2018 9/26/2018
Engineered Drainage Report No 8/29/2018 9/26/2018
Buffer Mitigation Plan Report No 8/29/2018 9/26/2018
Geotechnical Report No 8/29/2018 9/26/2018
Tree valuation report Yes 8/29/2018 9/26/2018
Stormwater Management (SWM) Plan Yes 8/29/2018 9/26/2018
Decision Criteria Yes 8/29/2018 9/26/2018
Design Guideline Checklist Yes 8/29/2018 9/26/2018
Traffic impact analysis Yes 8/29/2018 9/26/2018
Landscape plans Yes 8/29/2018 9/26/2018
Project Narrative Yes 8/29/2018 9/26/2018
Pre-Application Letter Yes 8/29/2018 9/26/2018
Water Availability letter Yes 8/29/2018 9/26/2018
Sewer availability letter Yes
Community Meeting Summary Yes 8/29/2018 9/26/2018
Environmental (SEPA) Checklist Yes 8/29/2018 9/26/2018
Project application Yes 8/29/2018 9/26/2018
Site Plan Yes 8/29/2018 9/26/2018
REVISION 1 No 10/9/2018 10/9/2018

Approval Steps
Step Status Date
Completeness Review Application deemed complete 9/27/2018
Application Complete Letter Completed 9/27/2018
Traffic Study/Analysis Review In Process
Natural Resources Planner Review In Process
Historic Preservation Commission Review In Process
Geotechnical Review by 3rd Party In Process 9/14/2018
Operations & Maintenance Review In Process 8/29/2018
Planning Review In Process 8/29/2018
Fire Dept Review Approved with Conditions 9/25/2018
Development Engineer Review In Process 8/29/2018
Design Review Board In Process 8/29/2018
Non-Motorized Transportation Commission In Process 8/29/2018
Critical Area Review In Process 8/29/2018

Reviews
Start Complete Applicant Response
9/26/2018

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations
Valuation Quantity Rate Value
Total: $0.00

Fees
Fee totals below may not reflect all fees, including fees calculated by hourly rates for resubmittals.
Fee Amount
Site Plan Review $8,586.00
Geologically Hazardous Area Third-Party Geotechnical Review Fee $2,500.00
Total : $11,086.00

Bonds
Type Number Amount Issued Expires Completed

Inspections
The inspections listed below are standard for all permits of this type. The inspections below may be inaccurate for a specific permit until that permit has been issued.
Completed On
Temporary Construction Access
After rough grading is complete (Call Public Works 206-780-3739)
Road Approach - Final (Call Public Works 206-780-3739)

Structures
Structure Use Occupancy Type Square Footage

Conditions
The conditions listed below are standard for all permits of this type. The conditions below may be inaccurate for a specific permit until the permit has been issued.
Your portal access code is

Required Permits
Type Requirement For Number Status

Associations