Contact
PLN51159 CUP Conditional Use Permit
Address:
9330 NE High School Rd
Bainbridge Island,  WA  98110
Parcel #: 22250240032008
Status: Completeness Review in process
Submitted: 11/21/2018
Approved:
Issued:
Closed:
Expired: 5/20/2019
Inspections:
Required: 1
Complete: 0
Total Fees:
$10,49400
Additional fees may be required
Project: Demolish existing 41,509 sf classroom and assembly building. Demolish existing 2,803 sf music building. Construct new 35,000 sf classroom building. Improvements to 2.5 acres of site area, including building footprint. Minor renovations to extant building to accommodate programs displaced by demolition.

Contacts
APPLICANT:
Capital Projects, Bainbridge Island School District No 303
OWNER:
Capital Projects, Bainbridge Island School District No 303

Contractors

Details

Parcels
Parcel Owner Address
22250240032008 BAINBRIDGE ISLAND HS ADMIN & ORDWAY ELEM 8513 MADISON AVE N
BAINBRIDGE ISLAND,  WA 98110

Submittals
If any submittal item(s) listed below is noted as "required", you will not be able to issue your permit. Please upload the required submittal item before proceeding.
Submittal Required Received Accepted
Plan Set (view notes) No 11/21/2018 n/a
Miscellaneous (view notes) No 11/21/2018 n/a
SAR Application (view notes) No 11/21/2018 n/a
Survey of Property No 11/21/2018 n/a
Tree Valuation Report Yes
Decision Criteria Yes 11/21/2018 n/a
Design Guideline Checklist (view notes) Yes 11/21/2018 n/a
Outdoor Lighting Plans (view notes) Yes 11/21/2018 n/a
Owner/Agent Agreement (view notes) Yes 11/21/2018 n/a
Project Narrative Yes 11/21/2018 n/a
Pre-Application Letter (view notes) Yes 11/21/2018 n/a
Environmental (SEPA) Checklist (view notes) Yes 11/21/2018 n/a
Project Application (view notes) Yes 11/21/2018

Approval Steps
Step Status Date
Completeness Review Application deemed complete 12/20/2018
Notice of Application Completed 4/1/2019
Application Complete Letter (view notes) Completed 12/20/2018
Application Incomplete Letter Not Applicable 12/20/2018
Operations & Maintenance Review Approved with Conditions 8/12/2019
Planning Review In Process 11/21/2018
Building Review In Process 11/21/2018
Development Engineer Review (view notes) Approved with Conditions 8/12/2019
Fire Dept Review In Process 11/21/2018

Reviews
Start Complete Applicant Response

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations
Valuation Quantity Rate Value
Total: $0.00

Fees
Fee totals below may not reflect all fees, including fees calculated by hourly rates for resubmittals.
Fee Amount
Condition Use Permit Fee $10,494.00
Total : $10,494.00

Bonds
Type Number Amount Issued Expires Completed

Inspections
The inspections listed below are standard for all permits of this type. The inspections below may be inaccurate for a specific permit until that permit has been issued.
Completed On
Visit and document the site

Structures
Structure Use Occupancy Type Square Footage

Conditions
The conditions listed below are standard for all permits of this type. The conditions below may be inaccurate for a specific permit until the permit has been issued.
Your portal access code is

Required Permits
Type Requirement For Number Status

Notes
Hearing Examiner Exhibits 4/18/2019
PLANNING COMMISSION PACKET 4/11/19: Staff Report (pp. 1-18); Attachment: A: Plans (pp. 20-29); Attachment B: SEPA Checklist (pp. 31-52); Attachment C: Design Guidelines checklists (pp: 54-150) Planning Commission Recorded Motion from 4/11/19 meeting. 4/8/2019
Mailing List 010819. SEPA Checklist w/Comments. Notice Postcard. Notice Invoice/Affidavit of Posting. Certificate of Posting. 1/10/2019

Associations