Contact
BLD22561 Residential Solar Panels
Address:
5433 NEW SWEDEN AVE NE
BAINBRIDGE ISLAND,  WA  98110
Parcel #: 35250230572000
Status: All inspections have been approved.
Submitted: 8/9/2017
Approved: 8/24/2017
Issued: 8/24/2017
Closed:
Expires: 3/13/2018
Inspections:
Required: 1
Complete: 1
Total Fees:
$98336
Additional fees may be required
Project: Installation of a 45(kW) solar photovoltaic system will be instlalled on roof of property.

Public Notice

Contacts
OWNER: BLOSSOM MAURLEN G
APPLICANT: Johanning, Chris

Contractors
GENERAL:
PUGET SOUND SOLAR LLC
License #: PUGETSS932MU

Details
BLD NO DWELL UNITS: 1
Installation is for a single family residence.: No
System is installed on a rooftop.: Yes
Modules are lower than the highest point of roof.: Yes
Rooftop materials are lightweight (i.e.: composition shingles, metal roofing, cedar shingles).: Yes
System is designed for minimum 110 mph wind speed.: Yes
System will be installed per manufacturer's specifications.: Yes
Total dead load of system is < 4lbs. per sq.foot.: Yes
Mounted modules are <18" above roof surface.: Yes
Point loads from system are < 50 lbs.: Yes
Module supports are non combustible.: Yes
Roof/wall penetrations are sealed and/or flashed.: Yes
Modules are UL 1703 listed and labeled.: Yes
Array is < 33% of roof area and is 1000 sqft or less.: Yes
An unobstructed pathway is provided along each side of any horizontal ridge.: Yes

Parcels
Parcel Owner Address
35250230572000 BLOSSOM MAURLEN G 5433 NEW SWEDEN AVE NE
BAINBRIDGE ISLAND,  WA 98110

Submittals
If any submittal item(s) listed below is noted as "required", you will not be able to issue your permit. Please upload the required submittal item before proceeding.
Submittal Required Received Accepted
Contract (signed by the property owner of record) authorizing work to be performed. Yes 8/16/2017 8/24/2017
Site Plan Yes 8/16/2017 8/24/2017
Specification Sheets Yes 8/16/2017 8/24/2017

Approval Steps
Step Status Date
Building Review Approved with Conditions 8/24/2017

Reviews
Start Complete Applicant Response
8/24/2017 8/24/2017

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations
Valuation Quantity Rate Value
Entered Valuation 45000.00 $1.00  / DOLLAR $45,000.00
Total: $45,000.00

Fees
Fee totals below may not reflect all fees, including fees calculated by hourly rates for resubmittals.
Fee Amount
Plan Check Fee $385.61
Building Permit Fee $593.25
SBCC $4.50
Total : $983.36

Bonds
Type Number Amount Issued Expires Completed

Inspections
The inspections listed below are standard for all permits of this type. The inspections below may be inaccurate for a specific permit until that permit has been issued.
Completed On
Final Building Inspection 9/14/2017

Structures
Structure Use Occupancy Type Square Footage

Conditions
The conditions listed below are standard for all permits of this type. The conditions below may be inaccurate for a specific permit until the permit has been issued.
Permit Expiration: All permits expire 180 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Extension requests must be received prior to permit expiration, or additional fees will be due to reactivate the permit.
Building plans and review shall be subject to the 2015 International Codes, or subsequent edition as adopted by Bainbridge City Council at time of building permit application.
ELECTRICAL WORK. If electrical work is proposed, a separate electrical permit is required. You can contact L&I at 360-415-4000 to obtain an electrical permit. Electrical systems must be inspected by L&I prior to requesting a framing inspection and final approval granted prior to requesting a final building inspection from the Department of Planning & Community Development.
Reinspection Fee: All approved construction plans, the approved site plan, the printed building permit, and the permit inspection placard are required to be on-site for inspection purposes, and work to be inspected shall be complete and ready for inspection. If an inspection is called for and plans are not available on site, or the work is not ready for inspection, or if previously identified corrections have not been made, approval will not be granted. In addition, a re-inspection fee will be charged and must be collected by the Department of Planning & Community Development prior to any further inspections being performed or approvals granted.
Final Inspection Required: All building permits shall have a final inspection performed and approved by the Department of Planning & Community Development prior to permit expiration. The failure to request a final inspection or failure to obtain final approval prior to expiration will be documented in the legal property records on file with Bainbridge Island as being non-compliant with Bainbridge Island ordinances and building regulations and will be referred to Code Compliance for action.
Installer to provide certification that all rooftop work has been done per the construction documents and the manufacturer’s recommendations.
In addition to the signage and markings required in NEC 690 an Identification Placard is required with the following text: “WARNING: PHOTOVOLTAIC POWER SOURCE” with red background, white lettering minimum 3/8” letter height, all capital letters, reflective, and weather resistant material. The placard should be placed on the exterior of the structure adjacent to the meter and within the main service disconnect. If the main service disconnect is operable with the service panel closed, then the placard should be placed on the outside cover. (IFC 605.11)
Noise Regulations (Chapter 16.16). Construction activities (site preparation, assembly, construction, erection, demolition, substantial repair, alteration or similar action on a property, buildings, structures or activities) within residential zones or within 100 feet of residential zones shall (A) be prohibited between the hours of 7:00pm and 7:00am on weekdays that do not constitute legal holidays; (B) be prohibited before 9:00am and after 6:00pm on Saturdays that do not constitute legal holidays; (C) be prohibited on Sundays and all legal holidays except that work on the inside of an enclosed structure may occur between the hours of 10:00am and 4:00pm.
State Legal Holidays for 2017: January 2, January 16, February 20, May 29, July 4, September 4, November 10, November 24, November 25, December December 25.

Required Permits
Type Requirement For Number Status

Notes

Associations