BLD25536 Residential Grading and Fill
Address:
10950 NE BROOMGERRIE RD
BAINBRIDGE ISLAND,  WA  98110
Parcel #: 41200000290301
Status: Application has all components for review.
Submitted: 4/20/2021
Approved:
Issued:
Closed:
Expires: 11/17/2021
Inspections:
Required: 7
Complete: 0
Total Fees:
$60514
Additional fees may be required
Project: COVID-19. E-FILE. Construction of water line to provide domestic service to the existing residence. The well has failed and the house currently has no water.

Public Notice
Description Begin Date End Date
Notice of Intent to Construct in a Landslide Hazard Area 06112021 6/9/2021  

Contacts
:
BROWNE WHEELER ENGINEERS, INC
:
LARSON LUKE & KRISTEN

Contractors

Details

Parcels
Parcel(s) associated with your permit.
Parcel Owner Address
41200000290202 SHEA JOHN T & CYNTHIA S **NO SITUS ADDRESS **
UNKNOWN,  WA 00000
41200000280203 ANDERSON SUSAN R 8120 Grand Ave NE
Bainbridge Island,  WA 98110
41200000290301 LARSON LUKE & KRISTEN 10950 NE BROOMGERRIE RD
BAINBRIDGE ISLAND,  WA 98110
41200000290004 SHEA JOHN T & CYNTHIA S 8126 Grand Ave NE
Bainbridge Island,  WA 98110

Submittals
If any submittal item(s) listed below is noted as "required", you will not be able to issue your permit. Please upload the required submittal item before proceeding.
Submittal Required Received Accepted
Geotechnical Step 2 Form Yes 4/30/2021 4/30/2021
Geotechnical Report Yes 4/30/2021 4/30/2021
Owner Agent Agreement (view notes) Yes 5/3/2021 5/3/2021
No Net Loss Report - Ecological Functions and Processes (view notes) Yes 4/27/2021 4/27/2021
Engineered Drainage Plan No 4/20/2021 4/20/2021
Kitsap Public Health District Documentation Yes 5/21/2021 5/21/2021
Geotechnical Step 1 Form Yes 4/20/2021 4/20/2021
Water Sewer Availability Request Yes 4/20/2021 4/20/2021
Road Approach Application (view notes) Yes 5/21/2021 5/21/2021
Project Application Yes 4/20/2021 4/20/2021
Site Plan (view notes) Yes 4/20/2021 5/21/2021

Approval Steps
Follow your application through the approval process.
Step Status Date
Notice of Intent Completed 6/11/2021
Permit application intake Completed 4/20/2021
Shoreline Review Additional Information Required 6/4/2021
Health District review In Process 4/20/2021
Operations & Maintenance Review In Process 4/20/2021
Critical Area Review (view notes) Approved 6/3/2021
RAA Application Review In Process 4/20/2021
Drainage Review In Process 4/20/2021
Planning Review (view notes) Additional Information Required 6/4/2021

Reviews
Start Complete Applicant Response
5/21/2021

Fixtures
Fixture Quantity Per Unit Value
Total: $0.00

Valuations
Valuation Quantity Rate Value
Total: $0.00

Fees
Fee totals below may not reflect all fees, including fees calculated by hourly rates for resubmittals.
Fee Amount
Grading Plan Review fee $0.00
Grading Permit Fee $33.14
Shoreline Exemption without SEPA $572.00
Critical Area Permit - Minor $0.00
Total : $605.14

Bonds
Type Number Amount Issued Expires Completed

Inspections
The inspections listed below are standard for all permits of this type. The inspections below may be inaccurate for a specific permit until that permit has been issued.
Completed On
Temporary Construction Access
After rough grading is complete (Contact Public Works: PWInspections@bainbridgewa.gov)
Road Approach Inspection
Temporary Silt & Erosion Control (Contact Public Works: PWInspections@bainbridgewa.gov)
Final Building
Road Approach - Final (Contact Public Works: PWInspections@bainbridgewa.gov)
Right of Way Inspection (Contact Public Works: PWInspections@bainbridgewa.gov)

Structures
Structure Use Occupancy Type Square Footage

Conditions
The conditions listed below are standard for all permits of this type. The conditions below may be inaccurate for a specific permit until the permit has been issued.
The proposed driveway or road approach work adjacent to a public street or right of way has been reviewed via a Road Approach Application submittal as part of the Building permit review. Any additional work in the public ROW will require a separate ROW Use Permit available from the Public Works Department. This permit is subject to independent review and additional fee requirements.
Approved plans shall not be changed, modified or altered without authorization from the Building Department. Revisions shall be submitted and approved by the Department of Planning and Community Development prior to inspection.
Any equipment and/or appurtenances not shown on this approved site plan (i.e. mechanical equipment, retaining walls, decks, etc.) are not approved. Revisions to plans must be submitted to COBI for approval prior to installation.
Permit Expiration: All permits expire 180 days after permit issuance, or 180 days after the last approved inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. Extension requests must be received prior to permit expiration, or additional fees will be due to reactivate the permit.
Any site retaining walls in excess of 4 feet in height will require a separate building permit under the City of Bainbridge Island Municipal Code Section 15.08.
Noise Regulations (Chapter 16.16). Construction activities (site preparation, assembly, construction, erection, demolition, substantial repair, alteration or similar action on a property, buildings, structures or activities) within residential zones or within 100 feet of residential zones shall (A) be prohibited between the hours of 7:00pm and 7:00am on weekdays that do not constitute legal holidays; (B) be prohibited before 9:00am and after 6:00pm on Saturdays that do not constitute legal holidays; (C) be prohibited on Sundays and all legal holidays except that work on the inside of an enclosed structure may occur between the hours of 10:00am and 4:00pm.
State Legal Holidays for 2021: January 1, January 18, February 15, May 31, July 5, September 6, November 11, November 25, November 26, December 24, December 31.

Required Permits
Type Requirement For Number Status

Notes
Mailing List 06/09/2021. Postcard Mailer. Postcard Proof. Affidavit of Publishing & Notice Invoice. 6/9/2021
Email regarding submittal 4/20/2021

Associations